WEST MAUI RECYCLED WATER EXPANSION
Project Cost
--
Electrical Cost
$1.6M
Location
Lahaina, Maui, Hawaii
Created the electrical design for the installation of two new UV disinfection channels and the retrofit of an existing channel. In addition, a new 500 kW standby diesel generator, primary substation and related power, controls, and SCADA system modifications were designed by MK Engineers.