WEST MAUI RECYCLED WATER EXPANSION

WestMauiRecycled.png

Project Cost
--

Electrical Cost
$1.6M

Location
Lahaina, Maui, Hawaii

 

Created the electrical design for the installation of two new UV disinfection channels and the retrofit of an existing channel. In addition, a new 500 kW standby diesel generator, primary substation and related power, controls, and SCADA system modifications were designed by MK Engineers.