UP-COUNTRY PHASE 6 & 10 BOOSTER STATION UPGRADES
Project Cost
--
Electrical Cost
$4.7M
Location
Oahu, Hawaii
Created the electrical design for upgrading phase 6 and phase 10 booster pump stations. The work consisted of the upgrading of the electrical services to each of the 6 pump stations, increased pump sizes, new and modified motor control centers, new metering switchboards and new and modified controls and SCADA systems. Pump sizes range from 200 HP to 450 HP. Designs included construction phasing to maintain pump station operation during construction.