BWS REPLACEMENT OF EMERGENCY POWER TRANSFORMERS & MISCELLANEOUS WORK AT HALAWA SHAFT, MILILANI WELLS I & IV AND WAHIAWA WELLS I

BWSReplacementPowerTransformer_Halawa_Mililani.jpg

Project Cost
$2.8M

Electrical Cost
$800K

Location
Honolulu, Oahu, Hawaii

 

This project involved the replacement of the emergency transformers at each of the project locations.  This included providing for new tie-ins to existing switchgear and/or switches.
 
For Wahiawa Wells, a new service switchgear line up was provided.  In addition to the new transformers, replacement of the chlorine systems for three of the sites with new sodium hypochlorite systems including any modifications or replacements of pumps, was necessary.  For Mililani I and Wahiawa I, the project also modified the site to widen driveways and access roads.  Mililani I included the construction of a new chemical and generator storage building.